ConceptDraw Project changes from v2.1 to v3.0

  • Redesigned interface - now ‘native’ interface for both platforms –Windows and Macintosh;
    Network diagram generating;
  • Calculation and displaying dates of Earliest start and Latest finish;
    Calculation and displaying time reserves;
  • Filtering tasks by different parameters;
    Sorting tasks by different parameters;
  • Inserting lists of tasks, divided with the line feed;
    Automatic terms shifting at change of the starting project date;
  • Changing color of a task;
    Changing font color;
  • Changing properties for marked out tasks simultaneously;
    Simultaneous dragging of marked out tasks on Gantt diagram either vertically or horizontally;
  • Simultaneous assigning resources to all subtasks of the marked out phase;
    Inserting data into marked out line of the resource view, without activation of edit mode;
  • Inputing data into cell: the first mouse click marks out a cell, the second activates the editing mode and highlights the whole text ( this operation can also be performed by double clicking at the selected cell), and the third click locates the text cursor at the position under the mouse cursor.
    Adding the new task after the highlighted one by using ‘Insert’ key;
  • Linking two tasks by dragging one of them onto another. This way the ‘finish to start’ link between two tasks will be created, begining from the task where dragging started to the task where mouse was released.
    Moving the hightlighted cell with Tab, Enter and with arrow keys.
  • Floating dialogs General, Resource, Notes, Project, Format, Assign Resournes;
    Renewed set of templates and examples;

Read more about ConceptDraw Project features.

ConceptDraw Project

• Support
• Upgrade
• Registration
• Version changes
• Technical Support
 
Subscribe to CS Odessa Newsletter
      Copyright 2009 Computer Systems Odessa Corporation. All rights reserved.
SEARCH