Program Evaluation and Review Technique (PERT) with ConceptDraw PRO

PERT method (Program Evaluation and Review Technique) is developed by the Ministry of Defense of the USA in 1958 in the framework of the project Polaris. PERT diagram is one of the tools for project management. With its help it is possible to analyze the time which is necessary for project execution and the consequence of tasks which involved into the project. The main advantage of such diagram type over the other diagram types is the possibility of calculation of the project fulfillment critical path that is the consequence of tasks which has the minimal float for execution and on which the total time for the whole project execution depends. If the task on the critical path is delayed than the execution of the whole project is delayed. There for it is important to calculate the critical path of the whole project execution and pay the most attention to tasks which appear on this way.

It should be considered that PERT diagram does not give you ready concrete decisions but it helps you to find these decisions.

PERT diagram is constructed by definite rules. It represents the set of tasks, connected between each other in the consecution of their execution.

There are two variants of PERT diagram construction. In the first variant the duration is denoted on arrow connecting diagram nodes. Such diagram type is called AOA (activity on arrow).

The second type of PERT diagram is called AON (activity on node). In such diagram the information about the task duration is denoted in the diagram node and each task is represented in the form of rectangle with the definite set of fields. These are the task name, duration, early and late starts and early and late finishes of the task and also the float for execution of the given task.

With the help of ConceptDraw you can build diagrams of any type, but we recommend you using of AON variant, because such diagram type is easier for building and perception.

PERT diagram starts from the task which does not have duration and does not use resources and presents just a project start. This is done to denote the common start of the project as starting from the first day of the project several tasks are starting simultaneously. Analogously PERT diagram finishes with the task “finish”.

No task is able to start before the preceding task is finished. Also each task may represent a separate project with its subtasks, which can be displayed on a separate diagram. In ConceptDraw this can be realized in the form of hyperlinks assigned to such tasks. These hyperlinks may point at some pages of your ConceptDraw document where the corresponding PERT diagrams are placed.

Objects for PERT diagrams building are gathered in a separate ConceptDraw objects library. To start working it is enough to launch PERT Chart template from the templates gallery.

To create a PERT diagram with ConceptDraw, it is enough to drag on a document page the number of ready objects, representing tasks, and then connect them between each other and fill out necessary task fields.

Task appeared on the calculated critical path are marked out with red color. This way any person is able to see at once tasks which require special attention.


Download ConceptDraw PRO
Business and Technical Diagramming Tool


Operating Systems:     Macintosh® (Mac OS X 10.4.10 or later)
    Microsoft® Windows® 7/VISTA/XP
Languages:     English

Price:   cd_name   currency_sing       Buy ConcepDraw 7
 Download Trial
 Buy Now
 Upgrade
NetDiagrammer and WebWave Plug-in


Read more about Business diagramming & Org Charts

Organigrams
Swim lane diagrams
Concept maps
Bubble diagram
Venn diagram
Use case diagrams
Total quality management
SSADM
PERT
Value stream
Work flow diagram


Timeline and Schedule
Schedule Formats
Schedule Formats




Project Timelines
Project Timelines




Site Project
Site Project




 
Subscribe to CS Odessa Newsletter
      Copyright 2010 Computer Systems Odessa Corporation. All rights reserved.
SEARCH